Project Description
FURTADO NEW ADDITION This project involved adding a dormer to the existing house in order to accommodate a new master suite. JPS performed the design work including the documentation of existing conditions. The design was broken down into three phases and was constructed by JPS. The finished addition included a master bedroom, walkthrough closet, and master bathroom. PROJECT TYPE: In-House Design